Building a patio: do's & don'ts

To create a patio that remains level and does not collect water, you build beneath the tiles, not on top of them. This step-by-step guide will help you lay a foundation that won't settle and keep your patio perfectly level for years to come.

Building a patio: do's & don'ts

5 steps to a sleek patio

03

Foundation: fabric, rubble and sand bed

Lay root barrier fabric (geotextile) to prevent invasive weeds. On top of that, add 10 to 15 cm of crushed rubble or a mix, tamping it down in layers. On top, create a 3 to 5 cm layer of leveling sand, leveling it carefully with a straight board on guide rails: this layer determines how level your patio will be.

Foundation: fabric, rubble and sand bed
05

Add, vibrate, re-add

Vibrate the terrace with a vibrating screed with a rubber mat (does not damage the tiles) and sweep joint sand into the joints. For ceramic tiles, use grout instead of sand. Let the sand settle for a few days, sweep it up and the terrace is ready.

Add, vibrate, re-add

Do's

  • Always allow for a 1 to 2 cm fall per metre away from the wall
  • Use weed membrane under the patio
  • Ram the foundation in layers to create a stable base
  • Screed the sand bed evenly using guide rails
  • Check each tile with a spirit level and string line
  • Order 5 to 10 percent extra tiles to allow for cutting waste

Don'ts

  • Do not lay directly on bare soil or only on sand
  • Do not allow the slope to run towards the house
  • Do not use a bare vibrating screed over ceramic or concrete tiles
  • Do not lay tiles 'by eye' without a string line
  • Do not walk on freshly laid tiles
  • Do not use jointing sand with ceramic tiles with narrow joints
At a glance This is what the job looks like in short: level sand bed, custom-cut tiles.